Taishan Construction gold mountain mark
TAISHANCONSTRUCTION
Prepared forHomeowner
Project86 Woodington Steps 3FT x 3
ProposalTS-2026-WOO-86
Scope for pricing86 Woodington Ave, Toronto, ON
Drawing: Scope Summary
Front yard transformation render — 86 Woodington Ave, Toronto

Prepared for Homeowner by Taishan Construction

86 Woodington Steps 3FT x 3

New steps and walkway,
built properly from the base up.

86 Woodington Ave, Toronto, ONPrepared today

Private proposal

Prepared exclusively for this project.

Prepared for the homeowner at 86 Woodington Ave. This scope covers the demolition and removal of the existing steps and concrete walkway, three new 3-foot-wide steps, and a new interlocking walkway. Each service is priced as a complete lump-sum.

Taishan Construction gold mountain mark
TAISHANDesign-First Exterior Transformation
Proposal statusDesign Review
Prepared forHomeowner
Prepared byTaishan Construction
Site address86 Woodington Ave, Toronto, ON
ReferenceScope Summary
Scope86 Woodington steps 3FT x 3
Work includesDemolition, 3 steps, walkway
Estimated durationConfirmed after approval
Last checkedChecking secure access…
Proposal IDTS-2026-WOO-86
Project total$2,200.00
VersionV1 — Scope Review

Project renders

See the approach.

Front yard and entrance detail views for 86 Woodington Ave.

Project approach

How Taishan Construction delivers this scope.

A focused sequence from demolition to turnover, coordinated with the homeowner.

01

Clear scope before we build

Demolition, three new 3-foot steps, and a new interlocking walkway — each item priced as a complete lump sum.

02

Built properly beneath the surface

Proper excavation, subgrade inspection, compacted aggregate base and controlled grading beneath every step and walkway section.

03

Clean execution

Each service is presented as a complete lump sum, so the homeowner knows exactly what is included before we mobilize.

04

Inspected and turned over

Step alignment, walkway stability and finished edges inspected, deficiencies corrected and a final walkthrough completed with the homeowner.

Scope of work

86 Woodington steps scope.

Three lump-sum services for the new steps and walkway at 86 Woodington Ave.

Remove the existing steps and concrete walkway and dispose of all debris, leaving the area ready for new construction.

  • Removal of existing steps
  • Removal of existing concrete walkway
  • Loading and disposal of all demolished material
  • Site cleanup and preparation for new work

Investment summary

Investment summary.

Every service is presented as a complete lump-sum investment covering all labour, materials, equipment, disposal and cleanup required for that portion of the work.

Quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and confirmation by the homeowner.

Project total — selected services$2,200.00CAD · updates as your selections change
Demolition + Removal$500.003 New Steps (3FT wide each)$700.00New Interlocking Walkway$1,000.00

Construction sequence

A staged construction schedule.

Under normal site, weather, access, and material-delivery conditions.

STAGE01

Demolition and Removal

Removal of the existing steps and concrete walkway, disposal of debris, and site preparation for the new work.

STAGE02

Excavation and Subgrade

Excavation for the step and walkway locations, subgrade inspection, fine grading and compaction.

STAGE03

Base and Installation

Compacted aggregate base placement, three new 3-foot-wide steps, interlocking walkway installation and edge restraint.

STAGE04

Final Inspection and Turnover

Step alignment, walkway stability and finished edges inspected, deficiencies corrected, and final walkthrough with the homeowner.

Review and confirmation

Scope review
with the homeowner

Please review your selected services above and confirm the scope, material selections and site conditions. Your project total reflects the services currently selected.

Note: All quantities are preliminary and subject to field verification, approved material selections, site access, utility conditions, and confirmation by the homeowner.

Questions? Contact Jeff directly.
Project86 Woodington steps 3FT x 3
DemolitionExisting steps and concrete walkway removal
New steps3 steps, 3FT wide each
WalkwayNew interlocking walkway
Estimated durationConfirmed after scope approval
ReferenceScope Summary
Project total — selected services$2,200.00
Estimated startTo be confirmed